Mobile water installatie: verschil tussen versies
Naar navigatie springen
Naar zoeken springen
(Nieuwe pagina aangemaakt met '{{Project |name=Mobile water installatie |start=2023 |contact=Okabe |info=Heet of koud het kan allemaal. |status=In Progress }} ''Dit is een plan wil je meedoen ed...') |
|||
| Regel 17: | Regel 17: | ||
* Testen | * Testen | ||
* Finishing touches | * Finishing touches | ||
| + | |||
| + | == MoSCoW == | ||
| + | Must have: | ||
| + | * Running water | ||
| + | * Drain collection | ||
| + | * Visual tank level monitoring | ||
| + | |||
| + | Should have: | ||
| + | * Warm water | ||
| + | * Decent flow rate (5L/min) | ||
| + | * Electrical tank level monitoring | ||
| + | |||
| + | Could have: | ||
| + | * Drinkable water | ||
| + | * Grey water emptying pump | ||
| + | * Wheels on the water tanks for easy refill/empty | ||
| + | |||
| + | Won't have: | ||
| + | * Water filtration / reuse | ||
== Design == | == Design == | ||
Versie van 23 aug 2023 22:33
| Project Mobile water installatie | |
|---|---|
| Name | Mobile water installatie |
| Start | 2023 |
| Contact | Okabe |
| Website | |
| Information | Heet of koud het kan allemaal. |
| Status | In Progress |
Dit is een plan wil je meedoen edit gerust de pagina.
Om makelijk je handen te kunnen wassen, schoonmaken & afwassen willen we de wasbak voorzien van een mobile water installatie.
Planning
- Een design maken
- Onderdelen bestellen
- In elkaar zetten
- Testen
- Finishing touches
MoSCoW
Must have:
- Running water
- Drain collection
- Visual tank level monitoring
Should have:
- Warm water
- Decent flow rate (5L/min)
- Electrical tank level monitoring
Could have:
- Drinkable water
- Grey water emptying pump
- Wheels on the water tanks for easy refill/empty
Won't have:
- Water filtration / reuse